Earthworks
Wall trench excavation
Bulk excavation by backhoe/excavator with manual dressing. Disposal is excluded and priced separately.
Reference execution rates are built from materials, labour, plant and logistics. Charismak's public rate carries no contractor profit. Open any item to review the calculation, then edit a private copy with your own prices, allowances and O/P.
Pilot methodology
Rates are reconstructed from Charismak project calculations and current market checks. Until a rate passes quantity, material, labour and market-validation checks, it is clearly marked Under validation rather than presented as a verified market rate. Formwork is system-specific: a project can use well-sawn plank below ground and marine plywood above ground by selecting the relevant build-ups separately.
Nigeria pilot
Earthworks
Bulk excavation by backhoe/excavator with manual dressing. Disposal is excluded and priced separately.
Earthworks
Excavate normal soil by hand to foundation trenches not exceeding about 1.0 m depth; trim sides and bottoms. Disposal excluded.
Earthworks
Return suitable excavated material to foundations in layers, spread, water as required and compact.
Earthworks
Approved laterite obtained off site, delivered, placed in layers and compacted.
Earthworks
Hardcore obtained off site, spread to make up levels and compacted in layers.
Earthworks
Sharp sand supplied, spread to required level and lightly compacted.
Earthworks
1000 gauge polythene DPM laid over prepared floor filling with laps and local cutting allowance.
Reinforcement
A142 welded mesh, 2.4 x 4.8 m sheet, including 5% lap/cutting allowance and laying labour.
Concrete
Nominal 1:3:6 site-mixed plain concrete using 20 mm aggregate; reinforcement and formwork excluded.
Concrete
Nominal 1:2:4 site-mixed concrete for non-designed applications where permitted by the specification.
Concrete
C25 structural concrete with minimum cement content 310 kg/m³. Reinforcement and formwork excluded.
Reinforcement
High-yield reinforcement by theoretical tonne, including 3% cutting/waste, binding/cutting consumables and fixing labour.
Masonry
230 mm hollow sandcrete block wall, 10 blocks/m² working basis, 5% block breakage and 1:6 mortar.
Masonry
150 mm hollow sandcrete wall, 10 blocks/m² working basis, 5% breakage and cement:sand mortar.
Finishes
15 mm average cement-sand plaster/render, floated finish, including material wastage and application labour.
Finishes
20 mm cement-sand backing/screed to wall surfaces ready to receive tiles.
Finishes
30 mm average cement-sand floor screed to receive tiles or other finishes.
Finishes
Supply and lay 600 x 600 porcelain floor tiles on prepared screed, including 15% cutting/waste, adhesive, spacers/grout allowance and laying labour.
Finishes
Supply and fix 600 x 300 wall tiles on prepared backing, including 15% cutting/waste, adhesive, spacers/trims allowance and labour.
Finishes
Prepare and apply three coats of approved emulsion paint to prepared plastered/screeded wall.
Formwork
Traditional formwork to footings, ground beams, plinths and low underground concrete faces using well-sawn straight 1x12 plank with four reuse cycles, 2x3 framing, 2x2 bracing, nails/release agent and carpentry labour.
Formwork
18 mm economical marine plywood column formwork with 2x2/2x3 framing, 2x6 walers, nails, release agent and fixing/striking labour.
Formwork
Beam/lintel formwork with reusable plywood, 2x2 and 2x3 timber, 2x6 bearers, Peri/H20 beam support allowance, nails, release agent and labour.
Formwork
Suspended slab formwork with reusable 18 mm plywood, 2x2/2x3 framing, 2x6 secondary bearers, Peri/H20 primary beams, nails, release agent and erection/striking labour.
Formwork
Stair/landing formwork with plywood facing, timber stringers/joists/bracing, 2x6/Peri support allowance, nails, release agent and higher-detail carpentry labour.
Doors & Windows
Install and dress client-supplied aluminium window unit, including normal fixing labour and minor consumables; major making-good excluded.
Doors & Windows
Install and dress client-supplied door and frame, including normal fixing consumables and labour.
Plumbing
Fix client-supplied WC and wash-hand basin set to prepared points, including normal connection and testing labour. Major pipe rerouting excluded.
Plumbing
Fix client-supplied sink and mixer to prepared supply/waste points; normal connection and testing included.
Plumbing
Fix client-supplied shower head/rail and control to prepared plumbing points.
Finishes
Fix client-supplied bathroom mirror with normal mechanical/adhesive fixings to prepared wall.
Plumbing
Fix client-supplied stainless-steel floor drain to prepared waste point and dress flush with finish.
Formwork
18 mm economical marine plywood wall formwork on 2x3 studs, 2x6 walers/strongbacks, ties/bracing, nails, release agent and fixing/striking labour. Plywood charged over 3 casting cycles.
Formwork
Well-sawn straight 1x12 plank column formwork with 2x3 studs, 2x6 walers, 2x2 bracing, nails/release agent and labour. Facing plank charged over 4 reuses.
Formwork
Traditional beam/lintel shuttering using well-sawn 1x12 plank facing, 2x3 framing, 2x6 bearers, bracing, nails/release agent and erection/striking labour. Plank charged over 4 reuses.
Formwork
Well-sawn plank shuttering to slab edges, kerbs and upstands with 2x3 framing, 2x2 bracing, nails and release agent. Plank charged over 4 reuses.
Formwork
Premium 18 mm marine/film-faced plywood slab soffit formwork with H20/Peri beams, Acrow props, secondary timber, nails/release agent and labour. Working plywood reuse: 5 cycles.
Finishes
10 mm average cement:sand (1:4) levelling screed with acrylic admixture, placed, ruled level and steel-trowelled.
Finishes
20 mm average cement:sand (1:4) levelling screed with acrylic admixture, placed, ruled level and steel-trowelled.
Finishes
23 mm average cement:sand (1:4) levelling screed with acrylic admixture, placed, ruled level and steel-trowelled.
Finishes
32 mm average cement:sand (1:4) levelling screed with acrylic admixture, placed, ruled level and steel-trowelled.
Finishes
Lay employer-supplied 20 mm marble on 10 mm cement/sand/admix bed including setting out, grouting, protection and cleaning.
Finishes
Lay employer-supplied narrow marble border strips to string lines with multiple cuts, 10 mm bedding, grouting, protection and cleaning.
Finishes
Template, cut and lay employer-supplied marble to shaped tops with mitred exposed edges, bedding, grout, protection and cleaning.
Finishes
Set out and lay employer-supplied patterned stone modules to design, including grouting and normal protection. Specialist adhesive measured separately.
Finishes
High-performance cement-based stone adhesive at approximately 14 kg/m² consumption, based on 25 kg bags.
Finishes
Lay employer-supplied engineered oak boards in straight strip layout including adhesive where required, cutting, edge trims and protection. Underlay separate.
Finishes
Lay employer-supplied engineered oak boards in chevron pattern including detailed setting out, angled cutting, adhesive, edge trims and protection.
Finishes
Lay employer-supplied decorative wood tiles including pattern alignment, adhesive, cutting, trims and protection.
Finishes
Supply and lay 3 mm high-density foam underlay beneath engineered wood flooring, including laps, cutting and normal waste.
Ceilings
Flat gypsum-board suspended ceiling including framing/supports, boards or forming material, fixings/joint treatment, installation labour and normal transport unless stated otherwise.
Ceilings
Straight stepped gypsum ceiling drop including framing/supports, boards or forming material, fixings/joint treatment, installation labour and normal transport unless stated otherwise.
Ceilings
Curved gypsum ceiling drop including framing/supports, boards or forming material, fixings/joint treatment, installation labour and normal transport unless stated otherwise.
Ceilings
Recessed / inverted gypsum ceiling with curved edges including framing/supports, boards or forming material, fixings/joint treatment, installation labour and normal transport unless stated otherwise.
Ceilings
30 mm thick × 150 mm wide POP edge detail with repeated longitudinal grooves, including forming/carving, sanding and finishing.
Ceilings
Bespoke moulded POP crown around top of column including forming, reinforcement/support, sanding and installation.
Ceilings
Conventional POP ceiling to general internal areas including support, POP material, forming, finishing and labour.
Ceilings
Prepare and apply POP skim coat to soffit, floated smooth ready for painting.
Roofing
Supply and fix 0.55 mm oven-baked aluminium roof covering to prepared timber support, including screws and normal laps/accessories.
Roofing
Supply and fix 600 mm wide aluminium ridge capping including laps, screws and dressing.
Roofing
Supply and fix 300 mm aluminium fascia to prepared support including screws, joints and dressing.
Roofing
50×150 mm wall plate / tie beam in tanalised sawn hardwood/timber, supplied, cut and fixed to roof framing.
Roofing
50×100 mm timber rafter in tanalised sawn hardwood/timber, supplied, cut and fixed to roof framing.
Roofing
50×100 mm roof strut / tie in tanalised sawn hardwood/timber, supplied, cut and fixed to roof framing.
Roofing
50×75 mm timber purlin in tanalised sawn hardwood/timber, supplied, cut and fixed to roof framing.
Roofing
50×75 mm roof noggin in tanalised sawn hardwood/timber, supplied, cut and fixed to roof framing.
Ceilings
Supply and fix external ceiling boards to prepared framing including normal cutting, fixings and installation.