Fix stainless-steel floor drain
Fix client-supplied stainless-steel floor drain to prepared waste point and dress flush with finish.
Methodology
Core drilling, new waste line and waterproofing repair are excluded.
Source basis
2-bedroom M&E labour BOQ guide.
Quantity basis
See exactly what makes up the rate
The rate is analysed for 1 No. of work. Enter the quantity you actually want to execute and every material, labour and plant quantity below will scale without changing the public Charismak reference rate.
What you need to buy
Material quantities
Quantities shown are for one unit of the measured work. The right-hand quantity scales automatically to the work quantity you enter.
| Resource | Type | Qty / 1 No. | Resource unit | Qty / 1 No. | Unit price | Cost / No. |
|---|---|---|---|---|---|---|
| Sealant / minor connection consumables | Consumable | 1 | No. | 1 | ₦500 | ₦500 |
Workmanship
Labour build-up
Labour is shown as the crew, trade, gang-day, day or piecework quantity used to produce one unit of the measured work.
| Resource | Type | Qty / 1 No. | Resource unit | Qty / 1 No. | Unit price | Cost / No. |
|---|---|---|---|---|---|---|
| Plumber fixing labour | Labour | 1 | No. | 1 | ₦1,500 | ₦1,500 |