Doors & Windows
Aluminium window installation and dressing
Install and dress client-supplied aluminium window unit, including normal fixing labour and minor consumables; major making-good excluded.
Methodology
Workmanship benchmark from the uploaded residential BOQ; window size and opening condition should be edited.
Source basis
2-bedroom labour BOQ guide.
Quantity basis
See exactly what makes up the rate
The rate is analysed for 1 No. of work. Enter the quantity you actually want to execute and every material, labour and plant quantity below will scale without changing the public Charismak reference rate.
What you need to buy
Material quantities
Quantities shown are for one unit of the measured work. The right-hand quantity scales automatically to the work quantity you enter.
| Resource | Type | Qty / 1 No. | Resource unit | Qty / 1 No. | Unit price | Cost / No. |
|---|---|---|---|---|---|---|
| Fixings / silicone / minor consumables | Consumable | 1 | No. | 1 | ₦1,500 | ₦1,500 |
Workmanship
Labour build-up
Labour is shown as the crew, trade, gang-day, day or piecework quantity used to produce one unit of the measured work.
| Resource | Type | Qty / 1 No. | Resource unit | Qty / 1 No. | Unit price | Cost / No. |
|---|---|---|---|---|---|---|
| Installation & dressing labour | Labour | 1 | No. | 1 | ₦20,000 | ₦20,000 |
Personal rate calculator
Change quantities, prices and allowances
Cost additions
